The following are projects, which have been completed to date:
Two Fast Track Pilot Projects have been facilitated within ERA-NET ROAD:
FTP1: Life-cycle analysis of open-graded asphalt pavements
FTP2: Performance management for low-noise pavements
FTP2 Executive Summary (click to download file)
FTP2 Technical Report (click to download file)
FTP2 Evaluation Report (click to download file)
Three Project Opportunities have been facilitated within ERA-NET ROAD.
PO2: Optimisation of Thin Asphalt Layers
PO3: Maintenance Backlog – Estimation and Use
PO4: Performance-Based Service Agreements in Routine and Periodic Maintenance
For more information on them, please click on the respective links above.
In addition to this, the following projects, which are part of past ERA-NET ROAD calls, have been completed:
2008 Call: Road Owners getting to Grips with Climate Change
IRWIN: Improved local Winter Index to assess Maintenance Needs and Adaptation Costs in Climate Change Scenarios
Improved tools for road owners are urgently needed to help them cope with rapidly progressing climate change. A very important tool for planning their activities is to have access to good scenarios regarding spatial and temporal resolution of what to be expected of climate variations in the future, especially regarding extreme events. Traditionally climate change scenarios are calculated based on ordinary meteorological data, which have large limitations in respect to resolution….
IRWIN Project Description (.pdf) Presentation IRWIN Project (.pdf) Presentation IRWIN Seminar - IRWIN Seminar 17th November 2009, Helsinki (.pdf) Presentation IRWIN - Overview of Methods and results(.pdf) IRWIN Final Report - December 2009



Completed Research